Commander III unique applications

Four-Track Commander III Unique Applications

 

Commander III, tunnel floor

Tunnel Floor In Germany: A GOMACO Commander III slipforms inside one of two seven kilometer (4.3 mi) long tunnels that are part of the Finne Tunnel project between Leipzig and Erfurt, Germany.

Read more about this project in GOMACO World 39.2.

 

 

 

Commander III, drainage channel

Tracks Turned At 35 Degree Angles: The Commander III's tracks were turned at 35 degree angles to pave inside the circular Finne Tunnel. The floor's profile was slipformed with a 720 millimeter (28.3 in) wide drainage channel.

 

 

 

Commander III, concrete floor in tunnel

Finne Tunnel Project: Two Leica Geosystems' total stations, one to the left and one to the right, track the Commander III as it completes slipforming the concrete floor in the first of two tunnels on the Finne Tunnel project.

 

 

 

Commander III, imprinted barrier

Imprinted Barrier In The United States: A unique, four-track, under-mounted barrier package is available for most types of barrier applications. The Commander III four-track with the under-mounted barrier is imprinting a stone pattern on the extruded wall.

 

 

 

Commander III, v ditch

V-Ditch In Australia: This contractor is slipforming V-ditch for drainage with a Commander III in Australia.

 

 

 

Commander III, rice fields irrigation

Rice Fields Irrigation In Turkey: This contractor slipforms a new water canal, with their four-track Commander III, to irrigate rice fields in Kesan, Turkey.

 

 

 

Commander III, tight clearance sidewalk

Tight-Clearance Sidewalk: A four-track Commander III with a sidemounted mold slipforms tight-clearance sidewalk in Penrith, New South Wales, Australia.

 

 

 

Commander III, imprinted flat surface

Imprinted Flat Surface: A roller mounted to the back of the four-track Commander III imprints a cobblestone pattern on the flat surface of the concrete on this project in Florida.

 

 

 

Commander III, longitudinal groove

Longitudinal Groove In Cattle Barn Floor: The Commander III paves the floor for a new cattle barn while applying a longitudinal groove. It was also slipformed with integral curb on both sides.

 

 

 

Commander III, v channel

V-Channel In Ireland: The contractor slipformed a v-channel with their Commander III on this drainage system in Ireland.

Read more about this project in GOMACO World 37.2.

 

 

 

Commander III, slotted drain

Slotted Drain: This contractor slipformed 11.8 in. (300 mm) diameter slot drain with their Commander III.

 

 

 

Commander III, slope paving

Slope Paving: This contractor slipforms a slope for a smaller canal with their Commander III four-track and a 9500 placing concrete on a project near Phoenix, Arizona.

 

 

 

Commander III, paving on curved tunnel walls

Paving On Curved Tunnel Walls In The UK: A Commander III, equipped with a 3D stringless guidance system, was used to slipform the floor and two evacuation walkways in the tunnel of the Channel Tunnel Rail Link project connecting London, England, to Europe.

Read more about this project in GOMACO World 33.1.

 

 

 

Commander III, paving on curved tunnel wall

Channel Tunnel Rail Link Project: The tracks on this Commander III were built to tilt up to a 35 degree angle to run on the curved walls of the Channel Tunnel Rail Link project.

 

 

 

Commander III, breakwater slope

1:2.4 Slope Project In Japan: This contractor in Japan has completed a slope project with their four-track Commander III. The project required them to slipform a 9.8 ft. (3 m) wide slab at a 1:2.4 slope. The project was part of building a slope on the inside of a breakwater.

Read more about this project in GOMACO World 34.1.

 

 

 

Commander III, tunnel paving

Five Different Profiles In France/Spain Tunnel: “Le Perthus” tunnel is the link between Perpignan in France and Figueras in Spain in the French/Spanish border town of Perthus. Two 28.5 ft. (8.7 m) diameter tunnels, each 5.2 miles (8.4 km) long, is part of the overall link connecting the two countries. The project was paved with a GOMACO Commander III.

Read more about this project in GOMACO World 37.1.

 

 

 

Commander III, tunnel paving

Le Perthus Tunnel: The Commander III on the Le Perthus tunnel was equipped with a Leica guidance system, which eliminated the need for stringline in the tunnel’s tight paving conditions.

 

 

 

 

 

 

Commander III, minimum clearance

Commander III, minimum clearance

Commander III, minimum clearance

High-Drive Tracks For Tight-Clearance Paving: GOMACO’s optional high-drive tracks are ideal for minimum-clearance situations that sometimes exist when adding lanes to ramps and highways or replacing streets in residential areas. The 11 in. (279 mm) wide track has a clearance height of 21.85 in. (555 mm) to the bottom of the track motor. The height of the motor allows clearance on the slab side of the track.

 

 

 

 

 

 

 

 

 

For Additional Information

 

Four-Track Commander III

Four-Track Commander III Photos: Slipform Paving - Barrier

Commander III Specifications

Download The Commander III Brochure (PDF)

Download The Whitetopping Brochure (PDF)

Download The GOMACO Full Line Brochure (PDF)

Commander III Information In: Deutsch - Español - Francais - Italiano - русский